| Project operation process | 
| employment objective | job content | Executive department | 
| Preparatory stage | Through the newspaper network exhibition and other media to do the company's advertising  | Market advertising department  | 
| Find target customers | Initiate and participate in customer follow-up for lighting engineering with strong demand and affordability | Market development department  | 
| Understand customer needs | Analysis of the target building drawing - understanding the architectural designer's intent | Project planning department | 
  | Effect design department  | 
  | Project Department | 
| Communicate with the structural engineer to understand the architectural features | 
  | 
| Communicate with electrical engineer to understand distribution load | 
  | 
Field reconnaissance of the project, the overall environment of photography, and some pictures to ensure completion of the building after the completion of the project / lighting effect in harmony with the surrounding environment  | 
  | 
| Seek advice from customers and related departments / reference for follow-up work. | 
  | 
| Analyze customer requirements | Analyze customer requirements for the project | 
  | 
| Analyze the performance requirements of designers and customers | 
  | 
| Analysis of the characteristics of the project structure - the full use of favorable factors | 
  | 
| Analysis of the surrounding environment, major roads and traffic flow direction | 
  | 
| Analysis of the main view of the people around the building | 
  | 
| Organize / summarize / study the information collected on the site - sketch | 
  | 
| Interim Design Stage | According to the standard of urban building flood lighting, combined with the integration of general lighting and individual lighting | Effect design department | 
  | 
  | 
  | Combining the advanced lighting concept with power economy | 
  | The combination of night lighting and daytime environment | 
  | Calculation of different parts of the building illumination / light / color temperature / color | 
  | Choose a reasonable lighting: LED/ floodlight | 
  | Interior lighting / dynamic lighting highlights green lighting | 
  | The simulation results of different schemes are designed according to the parameters such as elevation / illuminance / light / color temperature / color and so on | 
| Submission of drawings | Planning plan / overall effect map / local renderings / functional zoning map | 
  | Electrical drawings / construction schedule | Project Department | 
| Submission of documents | Description of the plan, reasonable investment estimation, electrical design requirements | Project budget department | 
| Scheme determination | Customer feedback / further refinement / implementation | Project planning department | 
  | 
  | 
  | 
| Later work content | Five points design, construction of five points | Project planning department | 
| Prior to construction | Insured property / personal accident insurance, to ensure that the interests of customers are not compromised | Project finance department | 
| During construction | Strictly follow the ISO90001 quality management system | Project planning department | 
  | Conscientiously implement the construction specifications and process standards | Project Department | 
| Final acceptance handover | Submit a complete set of construction and acceptance program text to customer | 
  | 
  | Responsible for the relevant personnel training system | 
  | 
| Service maintenance | Project free warranty period of one year / regular return visit | Customer service department | 
  | Once a year, the commissioning of lamps and cleaning services | Engineering maintenance department | 
  | All-weather response to customer service needs | Customer service department |